Steps

1. Complete removal of the existing roof system including tile, shingles, asphalt sealants, asphalt paper, boots, vents, and fasteners. Prepare any tie-in areas to existing roofs for reroof application.
2. Remove and replace any and all rotted roof sheathing throughout entire roof area.
3. Remove and replace any and all rotted fascia board.
4. Refasten entire roof deck using 8d ring shank nails to “code plus” strength. **note: this step may qualify for insurance reductions**
5. Install self-adhered modified rubber tile underlayment inverted "sandwich-strip" at all flashing areas and top layer to entire roof area.
6. For extra protection, install new modified rubber flat roof membrane at dead valley/wall/chimney detail areas, fastened, masticsized, and anchored to wall using fascia/cap anchor bar, where applicable.
7. For extra protection, install new sa-p modified rubber flat roof membrane at flat roof tie-in, fastened and masticsized, where applicable.
8. Install new VELUX self-flashed, all-in-one, leak proof, hurricane tempered glass skylight(s) over existing opening(s), fastened and masticsized, where applicable.
9. Install new lead boots over plumbing stacks and vents over exhaust areas, fastened and masticsized, where applicable.
10. Install new pre-painted drip edge flashings entire perimeter of roof, fastened and masticsized.
11. Install new valley metal down all valley areas, fastened and masticsized, where applicable.
12. Paint all boots and vents to match tile color, where applicable.
13. Install new solar powered attic ventilators with thermostat control for proper attic ventilation, fastened and masticsized, where applicable.
14. Install new pre-painted eave riser flashing metal at perimeter edge of roof.
15. Install tile to the entire roof area adhered using tile bond high wind resistance polyurethane foam adhesive and stainless steel screws.
16. Install cap tiles at all hip & ridge areas using ridge anchor, tile-tite cement and tile bond foam adhesive to achieve the highest wind resistance.
17. Clean up and remove all debris. Use magnet to remove fasteners from lawn.